BEGIN:VCALENDAR
CALSCALE:GREGORIAN
METHOD:PUBLISH
PRODID:-//104.16.252.80//NONSGML iCalcreator 2.6//
VERSION:2.0
BEGIN:VTIMEZONE
TZID:UTC
LAST-MODIFIED:20040110T032845Z
END:VTIMEZONE
BEGIN:VEVENT
UID:20260811T070115CDT-6934PmD11H@104.16.252.80
DTSTAMP:20260811T120115Z
DESCRIPTION:A look at Clearwater Dam: This last May Clearwater broke all re
 cords\; pool of record\, record release\, and first spill over the uncontr
 olled earthen spillway resulting in substantial erosion downstream of the 
 concrete control structures\n\nCorps of Engineers\n700 W. Capitol Avenue\,
  Federal Building 7th Floor\nLittle Rock\, AR 72203
DTSTART;TZID=UTC:20180627T164500
DURATION:PT1H15M0S
LOCATION:Corps of Engineers
SUMMARY:Clearwater Dam 2017 Flood
END:VEVENT
END:VCALENDAR
